Capability — Melbourne
Floor removal, grinding, levelling and moisture management for commercial projects across Melbourne, planned around the flooring system that goes down on top.
Substrate Problems
What We Do
01
Removal of existing floor coverings, adhesive residues and coatings, including epoxy coatings on contaminated slabs, and ride-on stripping on larger strip-outs.
02
Concrete floor preparation with three-phase grinders: taking off contaminants, weak surface material and high spots so levelling compounds, adhesives and coatings have a sound surface to bond to.
03
Self-levelling compounds placed by hand on smaller areas or pumped across larger floors, to give the finished floor the flatness it needs.
04
Moisture is checked before adhesives, resilient flooring or resin systems are committed to. Where it is a risk, management or remediation is built into the floor system rather than left to show up after handover.
05
Falls to waste and water management in wet areas, with waterproofing under vinyl where the specification calls for it.
06
Repairs to damaged substrates so the surface is sound and stable before the finish goes down.
Why It Matters
Many of the floor defects that appear after handover start underneath: adhesive that lets go, seams and joints that lift, coatings that delaminate, and unevenness that shows through thin resilient flooring. Once those defects are visible, the fix usually means taking the finished floor back up.
Resilient and resin systems also come with substrate requirements, set by the manufacturer and the project specification, covering moisture, flatness, soundness and surface preparation. Preparation is how a floor meets them.
Moisture is the easiest of these to underestimate. A slab can look dry and still hold enough moisture to break down adhesives or lift a floor covering over time, so it is far better dealt with before the floor goes down than after.
Preparation Through to Finish
JA Floors also installs the systems that go down on top of the preparation: commercial sheet and safety vinyl with coved skirting and welded seams, resin systems and hygienic wall sheeting. When we are engaged for the complete package, removal, grinding, levelling and moisture work are planned around the system being installed.
That keeps responsibility for the substrate and the finish in one place, instead of splitting it between contractors who each assume the other has it covered.
See how this applies in healthcare and aged care, laboratories and controlled environments and commercial kitchens, or browse all flooring capabilities.
For Builders and Facility Managers
Looking at the substrate early, so the preparation scope and its time on the program are understood before flooring reaches the critical path.
Preparation sequenced in stages inside operating facilities such as healthcare and aged care, coordinated with the other trades on site.
Our core team is directly employed and skilled across multiple tasks, which gives us tighter control over finish quality and program.
If the substrate turns out worse than expected, you hear about it early, with options, before it becomes a delay.
Pricing Your Project
Preparation is where the unknowns sit, so the more we know up front, the more accurate the scope and price. Useful information includes:
Start with the quote form. Drawings and specifications can be sent through once your enquiry is in. For anything time-critical, call (03) 9773 0472.
Tell us about the site, the program and the flooring system going down.